Uncategorized

ICARD 2015 : Scaling Leach Column Experiment from Laboratory Bench to Mine Site for Coal Mine Overburden

Add to cart

ICARD 2015 : Selecting Pit Lake Model Approaches Based on Data Availability

Add to cart

ICARD 2015 : Setting ARD Management Criteria for Mine Wastes with Low Sulfide and Negligible Carbonate Content

Add to cart

ICARD 2015 : Simulating the Performance of a Dry Stack Tailings Design for Water Control Permitting

Add to cart

ICARD 2015 : Simulation of Contaminant Transportation in Saturated Transparent Rock Fractures

Add to cart

ICARD 2015 : Simulation of Hydrological Processes in the Dump Slope of a Mining Pit for Landslide Forecasting

Add to cart

ICARD 2015 : Solving Mine Water Problems with Peat-based Sorption Media

Add to cart

ICARD 2015 : Sorption/Oxidation of Manganese in Aqueous System

Add to cart

ICARD 2015 : Start-Up of a Passive Remediation Bioreactor for Sulfate and Selenium Removal from Mine Tailings Water

Add to cart

ICARD 2015 : Sulfidogenic Diffusive Exchange System for the Treatment of Acid Mine Drainage

Add to cart

ICARD 2015 : Targeted Metagenomic Analysis of Mynydd Parys Acid Mine Drainage Microbial Communities

Add to cart

ICARD 2015 : Ten Years Later: The Ronneburg Waste Rock Relocation Project in the Light of Performance Monitoring and Sustainability Analysis

Add to cart

ICARD 2015 : The ADTI/SME Prediction Volume: Techniques for Predicting Metal Mining Influenced Water: The Consensus Process and What’s New

Add to cart

ICARD 2015 : The Calculation of Actual Evaporation from an Unsaturated Soil Surface

Add to cart

ICARD 2015 : The Canadian MEND Program – The First Twenty-Five Years

Add to cart

ICARD 2015 : The Diavik Waste Rock Project: Heat Transfer in a Large Scale Waste Rock Pile Constructed in a Permafrost Region

Add to cart